Thursday, October 9, 2014

Holding pattern

A few months ago we announced that we're going to be moving. There was a flurry of excitement as people want to see us in our new digs.
Things have been moving along from our perspective. We've finalized a layout and design features for the store, and are waiting on permits for construction.

We're still targeting December 2014 for opening, but the final date will be impacted by a few things. First off, our permits and construction. Second, the city's construction on Wellington St. at Gordon St.
Our construction is relatively straightforward, I believe. The city, not so much. They're working on a huge project, and they're targeting being done the project by November 30th, but still needing to do surface repairs into December. The main entrance into the plaza will be the light intersection of Dublin St. and Wellington St. If that light isn't active, the plaza won't be open.

So, right now, we're in a holding pattern. When things start up, they'll go fast. We'll be up and moving before you know it, and I'll do my best to post some pictures along the way. In the meantime, here are some pictures of the outside of the building, and of the inside.

Note the 25 foot tall ceilings! So bright!

We're 2 doors down from Starbucks!